Completed Projects

Completed Projects

Sl No. Business Unit Client Project Description Location/State Job Value Job Tenure Status
2 Telecom Jio Infocom Ltd. Laying of Optical fibre Cables through Conventional means and HDD method and splicing and termination with complete fibre testing Rajasthan 1.24 Cr 2024-25 Completed
3 Telecom Bharti Airtel Ltd. Laying of Optical fibre Cables through Conventional means and HDD method, blowing and splicing and termination with complete fibre testing Rajasthan 1.31 Cr 2024-25 Completed
4 Railways KEC International Ltd. Execution of Horizontal directional Drilling for crossing of S&T cables- RVNL Lal Kuan to Haldwani, Uttarakhand 2.5 Cr 2023-24 Completed
6 Railways KEC International Ltd. Execution of Horizontal directional Drilling for crossing of S&T cables for RVNL Bhatinda, Punjab 1.5 Cr 2022-23 Completed
7 Railways KEC International Ltd. Laying, termination and complete testing of S&T cables, with supply and installation of Signal posts, location boxes with casting of foundations for RVNL Mathura – Dholpur (UP & Rajasthan) 5.6 Cr 2023-2024 Completed
9 Railways Kalpataru Power Transmission Ltd. Laying, termination and complete testing of S&T cables, with supply and erection of Signal posts, location boxes with casting of foundations under DFCCIL (Eastern Corridor) Antri to Jhansi, Uttar Pradesh 2.5 Cr 2023-24 Completed
10 Railways KEC International Ltd. Laying, termination and complete testing of S&T cables, with supply and erection of Signal posts, location boxes with casting of foundations under DFCCIL (Eastern Corridor) Prayagraj to Bhaupur, Uttar Pradesh 2.8 Cr 2022-23 Completed
11 Railways L&T Construction-Transport Infrastructure Laying of S&T Cables, Installation of Signal outdoor equipment, termination and HDD works of DFCCIL (Western corridor) Vadodara to Saphale, Gujarat & Maharashtra 2.68 Cr 2021-2024 Completed
14 Oil & Gas Sabarmati Gas Ltd. Crossing of HDPE Gas line pipes of variable diameter through HDD method Ahmedabad, Gujarat 1.3 Cr 2021-2022 Completed